Project

General

Profile

Actions

Feature #4260

open
BA

[drcarrot-mobile-patient-care-2] orchestration run

Feature #4260: [drcarrot-mobile-patient-care-2] orchestration run

Added by Bot AI 4 days ago. Updated 4 days ago.

Status:
New
Priority:
Normal
Assignee:
-
Target version:
-
Start date:
10/26/2026
Due date:
% Done:

0%

Estimated time:
Source:

Description

Orchestration run tracking ticket. Not the real implementation ticket — this exists only so the live timing table has somewhere to post from step 1 onward. The real backend/mobile/web ticket(s) are created and cross-linked here once the run reaches that step.

Requirement:
"Implement the new patient care UI as per the attached design"

Attached file (read it directly for the real content): /opt/drcarrot-deploy/cross-repo-orchestration/contracts/.attachments/dev-hub-spec-zM7YAYp6mNzMAQH8P-Patient_Care_-_Requirements.md

BA Updated by Bot AI 4 days ago Actions #1

Account status — using account 2

  • Window usage so far: 21,463,645 tokens ($13.49) — 99% of its own last observed ceiling
  • Total dispatches on this account: 165

BA Updated by Bot AI 4 days ago · Edited Actions #2

Phase Timeline

# Process Start (IST) End (IST) Duration Input Output Cache Create Cache Read Tokens Cost Model
1 Requirement scope detection 26-10-2026 13:51:59 26-10-2026 13:52:29 29s 3 1,547 19,319 46,681 67,550 $0.1556 claude-sonnet-5
2 Initialise run ticket (timing anchor) 26-10-2026 13:52:29 26-10-2026 13:52:32 2s not available not available not available not available not available not available Script
3 Probe environment 26-10-2026 13:52:32 26-10-2026 13:52:37 5s not available not available not available not available not available not available API Script
4 Extract ticket-spec, acceptance criteria & test scenarios 26-10-2026 13:52:37 26-10-2026 13:55:28 3m 2,589 18,350 24,582 59,902 105,423 $0.4502 claude-sonnet-5
5 Prepare execution plan 26-10-2026 13:55:29 26-10-2026 13:55:29 0s not available not available not available not available not available not available Script
6 Initialise timing note 26-10-2026 13:55:29 26-10-2026 13:55:47 17s not available not available not available not available not available not available API Script
7 Execution plan — human gate 26-10-2026 13:55:48 -- -- n/a n/a n/a n/a n/a n/a n/a
— ORCHESTRATOR TOTAL (rows 7) — — 0s 0 0 0 0 0 $0.0000 —
— SHARED TOTAL (rows 1–6) — — 4m 2,592 19,897 43,901 106,583 172,973 $0.6058 —
— GRAND TOTAL (wall clock) 26-10-2026 13:51:59 26-10-2026 13:55:47 4m 2,592 19,897 43,901 106,583 172,973 $0.6058 —

ORCHESTRATOR TOTAL: 0s, 0 tokens, $0.0000 (rows 7)
SHARED TOTAL: 4m, 172,973 tokens, $0.6058, 4 row(s) with no token data (rows 1–6)

Total Run Time: 4m (wall clock, 26-10-2026 13:51:59 → 26-10-2026 13:55:47 IST — not a sum of the per-side totals above, since sides overlap)
Total Tokens Consumed: 172,973 (plus 4 row(s) whose usage was never captured — run execution_tracker.py enrich-audit to backfill. This is a floor, not the total.)
Token breakdown: input 2,592 · output 19,897 · cache-create 43,901 · cache-read 106,583 (62% of the total). Cache-read is context a node re-sends to itself across its own tool-use turns, billed at roughly a tenth of fresh input — a large Tokens number that is mostly cache-read is a long tool loop, not a large workload.
Total Cost: $0.6058 (plus 4 row(s) whose usage was never captured — run execution_tracker.py enrich-audit to backfill. This is a floor, not the total.)

Actions

Also available in: PDF Atom